ALACABEL TUNNEL PROJECT

Alacabel Tunnel, which started to be built on the land route between Seydişehir and Antalya and is intended to be 7.300 metres, is being built with 2 PROMAX FIXED 100 Concrete Plant. The project, of which construction has been continuing in 23. kilometre of land route within the scope of Alacabel Tunnel works which will connect Central Anatolia Region to Mediterranean Region, is intended to solve the traffic problems experienced especially in winter. When completed, land route between Seydişehir-Antalya will be 17 kilometres shorter.  With this project, which aims to eliminate the slopes and sharp turns, the rides will be more safe and comfortable.  The tunnel is aimed to be completed in 3 years.